IN SALAH GAS SOUTHERN FIELDS DEVELOPMENT PROJECT (BP - SONATRACH - STATOIL)

In In Salah project, the fields to be developed were Garet el Befinat, Hassi Moumene, In Salah and Gour Mahmoud. The development carried out by PETROFAC consisted in the construction of new central production and gas gathering facility at In Salah comprising 300 km of pipelines.


Salticom scope included design, engineering, supply and commissioning of the following systems :

  • Design & engineering of a Tetra radio system
  • Drive test for the Tetra radio system coverage
  • Installation & commissioning of 2 microwave links
  • Supply, installation and commissioning of a 4-site VHF trunked radio system for the construction phase
  • Type approval of all the telecom systems (17)